Pakistan
Pakistan
United Kingdom
China
Hong Kong
UAN: (042) 111-234-235 Monday - Saturday 09:00 - 18:00 42 E/1, Ghalib Road, Gulberg III, Lahore, Pakistan.
+441415792000 Monday - Saturday 09:00 - 18:00 Premier Business Park, 55 Jordanvale Ave. Whiteinch Glasgow, Scotland, UK
0086-755-82427221 Monday - Saturday 09:00 - 18:00 4th Floor, Building #610, Bagua Rd, Bagualing Futian District, Shenzen, Guangdong China
0852-6666 Monday - Saturday 09:00 - 18:00 Room No. 102-B, 1ST Floor, Mirror Tower, 61 Mody Road, East Tsim Sha Tsui, Kowloon, Hong Kong,
Pakistan
Pakistan
United Kingdom
China
Hong Kong
UAN: (042) 111-234-235 Monday - Saturday 09:00 - 18:00 42 E/1, Ghalib Road, Gulberg III, Lahore, Pakistan.
+441415792000 Monday - Saturday 09:00 - 18:00 Premier Business Park, 55 Jordanvale Ave. Whiteinch Glasgow, Scotland, UK
0086-755-82427221 Monday - Saturday 09:00 - 18:00 4th Floor, Building #610, Bagua Rd, Bagualing Futian District, Shenzen, Guangdong China
0852-6666 Monday - Saturday 09:00 - 18:00 Room No. 102-B, 1ST Floor, Mirror Tower, 61 Mody Road, East Tsim Sha Tsui, Kowloon, Hong Kong,

128KW Grid Tied Solar Power Plant installed at a leading Textile Unit in Kabirwala

Pakistan’s textile sector contributes to 60% of the country’s export. Being a successful candidate in international market, Pakistani textile industry is continuously seeking modern and high-tech facilities to improve quality of its products. One of the biggest challenges Pakistani textile industry is facing today is how to cut down its environmental burdens to cope with the international standards on the issue.

To sustain its leading role in export markets, Pakistan has to comply with international environmental protocols. The Pakistan Agricultural Research Council has warned that Pakistan’s textile exports face a bleak prospect in the coming years unless the government adopts focussed measures to address the concerns relating to environment and updating of technology. In fossil fuel-run textile units, toxic emissions into the air and ground water are the major environmental concerns.

Renewable Energy Resources can conveniently answer all these concerns. Pakistan being the hub of solar energy, solar technology has a huge potential to revolutionize the energy sector of the country. Premier Energy’s grid tied solar power plants are an ideal solution for the Energy Requirements of the Textile Sector. Not only do these modern sophisticated energy systems ensure uninterrupted supply of energy but also lead to a considerable reduction in CO2 Emission earning the client carbon credits and reducing the toxic emissions that result from fossil fuel based running.

Premier Energy holds the record of installing the Largest and Second Largest solar Power Plant of Textile Sector. The largest solar power plant of textile sector has been installed at Kabirwala at a leading textile company. Premier Energy’s Grid Tied Solar Power Plants are an ideal solution to the energy requirements of Textile and Spinning Units since they ensure uninterrupted supply of energy leading to better production. The roof mounted system is equipped with Polycrystalline Panels (4 bus-bar series) of 255 watts each. The project adheres to the HSE Standards and adds to the CSR Profile of our client entitling them as supporters of Green Energy.  The project was commissioned within the time frame allocated by the client thus maintaining the record of 100% client satisfaction.

For FREE Energy Audit & FREE Installation Call (042) 111 234 235, send email at sales@premierenergy.com.pk or visit www.premierenergy.com.pk.For Retailing & further orders contact us.

FREE ENERGY AUDIT